News 4-25-07 Construction Updates

4/25/07 - CONSTRUCTION UPDATES - The Montage is now adding its two upper floors to the existing tower using a huge crane; the space on Second and Sierra (with the black boards over the windows) had their doors open today during construction, and I was impressed with what I saw peeking in, including exposed brick, intricate wood arches, booth seating being constructed tells me it could be a restaurant; Insanely wide sidewalks are being poured on the west side of Palladio, wide enough for outdoor seating for sure; the basic curb/street layout for Grant's Landing is complete, they should be pouring the streets any day now. On a side note, when I walked by City Hall today with my dog, Sharon Zadra was on her way inside and stopped to talk about German Shepherds with me for about five minutes. Even gave my dog a doggy treat. She's nice, my first time meeting her.



Post your comments
Posted by: Prime - 4/25/2007 7:49:10 PM
Have any of the 8 on center units sold yet?

Posted by: Mike Van H - 4/25/2007 8:19:34 PM
Yes 2 have sold and a third is under contract I believe. Judging from the number of people at their open house there is a lot of interest in the other remaining units.